Guava Street over Murrieta Creek
GoodRiverside County, California · 0.1 MI Ne/O Washington Av · Structure no. 56C0637
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 493 ft
- 5 main spans
- Daily traffic
- 2,793
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Guava Street over Murrieta Creek is a concrete continuous box beam or girders - multiple carrying Guava Street over Murrieta Creek in Riverside County, California. It was built in 2018, so it is 7 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,793 vehicles a day, roughly 1% of them trucks, projected to reach 3,579 by 2044. The structure is 493 ft (150.3 m) long and 48 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Guava Street over Murrieta Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is Guava Street over Murrieta Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Guava Street over Murrieta Creek carry?
About 2,793 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Guava Street over Murrieta Creek?
The structure is 493 ft (150.3 m) long with a longest span of 107 ft (32.6 m) and a deck 48 ft wide.
Who owns Guava Street over Murrieta Creek?
It is owned by the City or Municipal Highway Agency.