Foothill Parkwy NB over Mwd Pipeline
GoodRiverside County, California · 0.2 MI S of Paseo Grande · Structure no. 56C0635R
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected September 2021
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 212 ft
- 3 main spans
- Daily traffic
- 5,000
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Foothill Parkwy NB over Mwd Pipeline is a prestressed concrete continuous box beam or girders - multiple carrying Foothill Parkwy NB over Mwd Pipeline in Riverside County, California. It was built in 2017, so it is 8 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 5% of them trucks, projected to reach 7,000 by 2040. The structure is 212 ft (64.6 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Foothill Parkwy NB over Mwd Pipeline built?
It was built in 2017, making it 8 years old in 2025.
What condition is Foothill Parkwy NB over Mwd Pipeline in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2021.
How much traffic does Foothill Parkwy NB over Mwd Pipeline carry?
About 5,000 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is Foothill Parkwy NB over Mwd Pipeline?
The structure is 212 ft (64.6 m) long with a longest span of 92 ft (28 m) and a deck 44 ft wide.
Who owns Foothill Parkwy NB over Mwd Pipeline?
It is owned by the City or Municipal Highway Agency.