US Bridges

Foothill Parkwy NB over Mwd Pipeline

Good

Riverside County, California · 0.2 MI S of Paseo Grande · Structure no. 56C0635R

Built
2017
8 years old
Condition
Good
inspected September 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
212 ft
3 main spans
Daily traffic
5,000
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Foothill Parkwy NB over Mwd Pipeline is a prestressed concrete continuous box beam or girders - multiple carrying Foothill Parkwy NB over Mwd Pipeline in Riverside County, California. It was built in 2017, so it is 8 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 5% of them trucks, projected to reach 7,000 by 2040. The structure is 212 ft (64.6 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesFoothill Parkwy NB
CrossesMwd Pipeline
Location0.2 MI S of Paseo Grande
RouteCity Street 0
Coordinates33.8604, -117.61257
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionSeptember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length212 ft (64.6 m)
Longest span92 ft (28 m)
Deck width44 ft (13.4 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2014)
Projected traffic7,000 by 2040
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesRelief for waterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Foothill Parkwy NB over Mwd Pipeline built?

It was built in 2017, making it 8 years old in 2025.

What condition is Foothill Parkwy NB over Mwd Pipeline in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2021.

How much traffic does Foothill Parkwy NB over Mwd Pipeline carry?

About 5,000 vehicles per day (2014 count), of which roughly 5% are trucks.

How long is Foothill Parkwy NB over Mwd Pipeline?

The structure is 212 ft (64.6 m) long with a longest span of 92 ft (28 m) and a deck 44 ft wide.

Who owns Foothill Parkwy NB over Mwd Pipeline?

It is owned by the City or Municipal Highway Agency.