US Bridges

Heacock St. over Perris Valley Channel

Good

Riverside County, California · 0.1 MI S/O Krameria St. · Structure no. 56C0610

Built
2013
12 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
80 ft
4 main spans
Daily traffic
18,500
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Heacock St. over Perris Valley Channel is a concrete culvert carrying Heacock St. over Perris Valley Channel in Riverside County, California. It was built in 2013, so it is 12 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,500 vehicles a day, roughly 2% of them trucks, projected to reach 24,000 by 2041. The structure is 80 ft (24.4 m) long and 101 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHeacock St.
CrossesPerris Valley Channel
Location0.1 MI S/O Krameria St.
RouteCity Street 0
Coordinates33.88214, -117.24337
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span19 ft (5.7 m)
Deck width101 ft (30.7 m)
Roadway width74 ft (22.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,500 (2017)
Projected traffic24,000 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Heacock St. over Perris Valley Channel built?

It was built in 2013, making it 12 years old in 2025.

What condition is Heacock St. over Perris Valley Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Heacock St. over Perris Valley Channel carry?

About 18,500 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Heacock St. over Perris Valley Channel?

The structure is 80 ft (24.4 m) long with a longest span of 19 ft (5.7 m) and a deck 101 ft wide.

Who owns Heacock St. over Perris Valley Channel?

It is owned by the City or Municipal Highway Agency.