US Bridges

Loma Linda Road over Pechanga Parkway Channel

Good

Riverside County, California · 0.8 MI S RTE 79 · Structure no. 56C0557

Built
2008
17 years old
Condition
Good
inspected July 2022
Type
Culvert
Concrete
Length
46 ft
3 main spans
Daily traffic
400
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

Loma Linda Road over Pechanga Parkway Channel is a concrete culvert carrying Loma Linda Road over Pechanga Parkway Channel in Riverside County, California. It was built in 2008, so it is 17 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, roughly 1% of them trucks, projected to reach 811 by 2040. The structure is 46 ft (13.9 m) long and 86 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLoma Linda Road
CrossesPechanga Parkway Channel
Location0.8 MI S RTE 79
RouteCity Street 0
Coordinates33.46734, -117.1175
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length46 ft (13.9 m)
Longest span14 ft (4.3 m)
Deck width86 ft (26.2 m)
Roadway width56 ft (17 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2012)
Projected traffic811 by 2040
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Loma Linda Road over Pechanga Parkway Channel built?

It was built in 2008, making it 17 years old in 2025.

What condition is Loma Linda Road over Pechanga Parkway Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2022.

How much traffic does Loma Linda Road over Pechanga Parkway Channel carry?

About 400 vehicles per day (2012 count), of which roughly 1% are trucks.

How long is Loma Linda Road over Pechanga Parkway Channel?

The structure is 46 ft (13.9 m) long with a longest span of 14 ft (4.3 m) and a deck 86 ft wide.

Who owns Loma Linda Road over Pechanga Parkway Channel?

It is owned by the City or Municipal Highway Agency.