Squaw Mountain Rd. over Temescal Wash
GoodRiverside County, California · 0.10 Mi. E/O Temescal Cyn · Structure no. 56C0525
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 152 ft
- 2 main spans
- Daily traffic
- 1,222
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Squaw Mountain Rd. over Temescal Wash is a prestressed concrete continuous stringer/multi-beam or girder carrying Squaw Mountain Rd. over Temescal Wash in Riverside County, California. It was built in 2002, so it is 23 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,222 vehicles a day, roughly 1% of them trucks, projected to reach 2,053 by 2041. The structure is 152 ft (46.3 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Squaw Mountain Rd. over Temescal Wash built?
It was built in 2002, making it 23 years old in 2025.
What condition is Squaw Mountain Rd. over Temescal Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Squaw Mountain Rd. over Temescal Wash carry?
About 1,222 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Squaw Mountain Rd. over Temescal Wash?
The structure is 152 ft (46.3 m) long with a longest span of 74 ft (22.7 m) and a deck 70 ft wide.
Who owns Squaw Mountain Rd. over Temescal Wash?
It is owned by the County Highway Agency.