Perris Blvd over Perris Valley Lateral"b"
GoodRiverside County, California · 0.05 MI N of Oleander Av. · Structure no. 56C0511
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected July 2023
- Type
- Slab
- Concrete Continuous
- Length
- 98 ft
- 3 main spans
- Daily traffic
- 26,300
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Perris Blvd over Perris Valley Lateral"b" is a concrete continuous slab carrying Perris Blvd over Perris Valley Lateral"b" in Riverside County, California. It was built in 2004, so it is 21 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 26,300 vehicles a day, roughly 2% of them trucks, projected to reach 15,252 by 2041. The structure is 98 ft (29.9 m) long and 98 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Perris Blvd over Perris Valley Lateral"b" built?
It was built in 2004, making it 21 years old in 2025.
What condition is Perris Blvd over Perris Valley Lateral"b" in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Perris Blvd over Perris Valley Lateral"b" carry?
About 26,300 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Perris Blvd over Perris Valley Lateral"b"?
The structure is 98 ft (29.9 m) long with a longest span of 32 ft (9.7 m) and a deck 98 ft wide.
Who owns Perris Blvd over Perris Valley Lateral"b"?
It is owned by the City or Municipal Highway Agency.