Pierson Boulevard over Mission Creek
FairRiverside County, California · 0.3 Mi. E/O Indian Avenue · Structure no. 56C0496
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 219 ft
- 3 main spans
- Daily traffic
- 6,200
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pierson Boulevard over Mission Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Pierson Boulevard over Mission Creek in Riverside County, California. It was built in 1995, so it is 30 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,200 vehicles a day, roughly 1% of them trucks, projected to reach 8,551 by 2047. The structure is 219 ft (66.6 m) long and 39 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pierson Boulevard over Mission Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is Pierson Boulevard over Mission Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Pierson Boulevard over Mission Creek carry?
About 6,200 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Pierson Boulevard over Mission Creek?
The structure is 219 ft (66.6 m) long with a longest span of 71 ft (21.6 m) and a deck 39 ft wide.
Who owns Pierson Boulevard over Mission Creek?
It is owned by the City or Municipal Highway Agency.