US Bridges

Calle Del Oso Oro over Murrieta Creek

Good

Riverside County, California · 0.5 M Sw/O Washington Av · Structure no. 56C0480

Built
1998
27 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
248 ft
3 main spans
Daily traffic
1,152
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Calle Del Oso Oro over Murrieta Creek is a prestressed concrete continuous box beam or girders - multiple carrying Calle Del Oso Oro over Murrieta Creek in Riverside County, California. It was built in 1998, so it is 27 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,152 vehicles a day, roughly 1% of them trucks, projected to reach 2,153 by 2042. The structure is 248 ft (75.6 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCalle Del Oso Oro
CrossesMurrieta Creek
Location0.5 M Sw/O Washington Av
RouteCity Street 0
Coordinates33.56939, -117.24166
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length248 ft (75.6 m)
Longest span100 ft (30.5 m)
Deck width40 ft (12.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,152 (2018)
Projected traffic2,153 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Calle Del Oso Oro over Murrieta Creek built?

It was built in 1998, making it 27 years old in 2025.

What condition is Calle Del Oso Oro over Murrieta Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Calle Del Oso Oro over Murrieta Creek carry?

About 1,152 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Calle Del Oso Oro over Murrieta Creek?

The structure is 248 ft (75.6 m) long with a longest span of 100 ft (30.5 m) and a deck 40 ft wide.

Who owns Calle Del Oso Oro over Murrieta Creek?

It is owned by the City or Municipal Highway Agency.