Limited Avenue over Elsinore Channel
FairRiverside County, California · 0.2 Mi. W/O Main Street · Structure no. 56C0459
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 97 ft
- 3 main spans
- Daily traffic
- 2,652
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Limited Avenue over Elsinore Channel is a concrete continuous slab carrying Limited Avenue over Elsinore Channel in Riverside County, California. It was built in 1996, so it is 29 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,652 vehicles a day, roughly 1% of them trucks, projected to reach 6,456 by 2042. The structure is 97 ft (29.5 m) long and 92 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Limited Avenue over Elsinore Channel built?
It was built in 1996, making it 29 years old in 2025.
What condition is Limited Avenue over Elsinore Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Limited Avenue over Elsinore Channel carry?
About 2,652 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Limited Avenue over Elsinore Channel?
The structure is 97 ft (29.5 m) long with a longest span of 38 ft (11.6 m) and a deck 92 ft wide.
Who owns Limited Avenue over Elsinore Channel?
It is owned by the City or Municipal Highway Agency.