US Bridges

Perez Road over Cathedral Cyn N Channel

Good

Riverside County, California · 0.2 Mi. W/O Cathedral Cyn · Structure no. 56C0375

Built
1988
37 years old
Condition
Good
inspected March 2022
Type
Slab
Concrete
Length
38 ft
1 main span
Daily traffic
10,000
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Perez Road over Cathedral Cyn N Channel is a concrete slab carrying Perez Road over Cathedral Cyn N Channel in Riverside County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 1% of them trucks, projected to reach 20,884 by 2042. The structure is 38 ft (11.7 m) long and 89 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPerez Road
CrossesCathedral Cyn N Channel
Location0.2 Mi. W/O Cathedral Cyn
RouteCity Street 0
Coordinates33.78481, -116.47041
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length38 ft (11.7 m)
Longest span35 ft (10.7 m)
Deck width89 ft (27.1 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2020)
Projected traffic20,884 by 2042
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Perez Road over Cathedral Cyn N Channel built?

It was built in 1988, making it 37 years old in 2025.

What condition is Perez Road over Cathedral Cyn N Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does Perez Road over Cathedral Cyn N Channel carry?

About 10,000 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Perez Road over Cathedral Cyn N Channel?

The structure is 38 ft (11.7 m) long with a longest span of 35 ft (10.7 m) and a deck 89 ft wide.

Who owns Perez Road over Cathedral Cyn N Channel?

It is owned by the City or Municipal Highway Agency.