Cedar Avenue over Bautista Creek Channel
GoodRiverside County, California · 0.2 Mi. E/O Mountain Ave. · Structure no. 56C0350
- Built
- 1985
- 40 years old
- Condition
- Good
- inspected July 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 2,759
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Cedar Avenue over Bautista Creek Channel is a prestressed concrete stringer/multi-beam or girder carrying Cedar Avenue over Bautista Creek Channel in Riverside County, California. It was built in 1985, so it is 40 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,759 vehicles a day, roughly 1% of them trucks, projected to reach 3,668 by 2040. The structure is 61 ft (18.6 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cedar Avenue over Bautista Creek Channel built?
It was built in 1985, making it 40 years old in 2025.
What condition is Cedar Avenue over Bautista Creek Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2022.
How much traffic does Cedar Avenue over Bautista Creek Channel carry?
About 2,759 vehicles per day (2016 count), of which roughly 1% are trucks.
How long is Cedar Avenue over Bautista Creek Channel?
The structure is 61 ft (18.6 m) long with a longest span of 56 ft (17.1 m) and a deck 33 ft wide.
Who owns Cedar Avenue over Bautista Creek Channel?
It is owned by the County Highway Agency.