US Bridges

San Timoteo Cyn RD over San Timoteo Creek

Fair

Riverside County, California · 0.3 MI W/O Woodhouse Road · Structure no. 56C0244

Built
1971
54 years old
Condition
Fair
inspected April 2024
Type
Tee Beam
Concrete Continuous
Length
103 ft
3 main spans
Daily traffic
2,544
2014 count
Owner
County
County Highway Agency

About this bridge

San Timoteo Cyn RD over San Timoteo Creek is a concrete continuous tee beam carrying San Timoteo Cyn RD over San Timoteo Creek in Riverside County, California. It was built in 1971, so it is 54 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,544 vehicles a day, roughly 1% of them trucks, projected to reach 1,572 by 2042. The structure is 103 ft (31.4 m) long and 32 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesSan Timoteo Cyn RD
CrossesSan Timoteo Creek
Location0.3 MI W/O Woodhouse Road
RouteCounty Highway 0
Coordinates33.97281, -117.08533
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40.7 US tons
Inventory rating28.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length103 ft (31.4 m)
Longest span40 ft (12.2 m)
Deck width32 ft (9.9 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,544 (2014)
Projected traffic1,572 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was San Timoteo Cyn RD over San Timoteo Creek built?

It was built in 1971, making it 54 years old in 2025.

What condition is San Timoteo Cyn RD over San Timoteo Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does San Timoteo Cyn RD over San Timoteo Creek carry?

About 2,544 vehicles per day (2014 count), of which roughly 1% are trucks.

How long is San Timoteo Cyn RD over San Timoteo Creek?

The structure is 103 ft (31.4 m) long with a longest span of 40 ft (12.2 m) and a deck 32 ft wide.

Who owns San Timoteo Cyn RD over San Timoteo Creek?

It is owned by the County Highway Agency.