Murrieta Hot SP RD over Warm Springs Creek
FairRiverside County, California · 0.9 Mi. E/O Route 215 Fwy · Structure no. 56C0229
- Built
- 1973
- 52 years old, rebuilt 2010
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 99 ft
- 3 main spans
- Daily traffic
- 28,462
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Murrieta Hot SP RD over Warm Springs Creek is a concrete continuous slab carrying Murrieta Hot SP RD over Warm Springs Creek in Riverside County, California. It was built in 1973 and reconstructed in 2010, so it is 52 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 28,462 vehicles a day, roughly 1% of them trucks, projected to reach 38,734 by 2042. The structure is 99 ft (30.2 m) long and 89 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Murrieta Hot SP RD over Warm Springs Creek built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2010.
What condition is Murrieta Hot SP RD over Warm Springs Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Murrieta Hot SP RD over Warm Springs Creek carry?
About 28,462 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Murrieta Hot SP RD over Warm Springs Creek?
The structure is 99 ft (30.2 m) long with a longest span of 36 ft (11 m) and a deck 89 ft wide.
Who owns Murrieta Hot SP RD over Warm Springs Creek?
It is owned by the City or Municipal Highway Agency.