US Bridges

Alessandro Boulevd over Sunnymead Storm Channel

Good

Riverside County, California · At Heacock Street · Structure no. 56C0146

Built
1960
65 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
26 ft
2 main spans
Daily traffic
30,000
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Alessandro Boulevd over Sunnymead Storm Channel is a concrete culvert carrying Alessandro Boulevd over Sunnymead Storm Channel in Riverside County, California. It was built in 1960, so it is 65 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,000 vehicles a day, roughly 2% of them trucks, projected to reach 45,792 by 2041. The structure is 26 ft (7.9 m) long and 153 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAlessandro Boulevd
CrossesSunnymead Storm Channel
LocationAt Heacock Street
RouteCity Street 0
Coordinates33.9167, -117.24397
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length26 ft (7.9 m)
Longest span17 ft (5.2 m)
Deck width153 ft (46.5 m)
Roadway width96 ft (29.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,000 (2019)
Projected traffic45,792 by 2041
Trucks2%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Alessandro Boulevd over Sunnymead Storm Channel built?

It was built in 1960, making it 65 years old in 2025.

What condition is Alessandro Boulevd over Sunnymead Storm Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Alessandro Boulevd over Sunnymead Storm Channel carry?

About 30,000 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is Alessandro Boulevd over Sunnymead Storm Channel?

The structure is 26 ft (7.9 m) long with a longest span of 17 ft (5.2 m) and a deck 153 ft wide.

Who owns Alessandro Boulevd over Sunnymead Storm Channel?

It is owned by the City or Municipal Highway Agency.