Interstate 215 over Walliser Drain
GoodRiverside County, California · 08-RIV-215-R30.36 · Structure no. 56 0781
- Built
- 1994
- 31 years old
- Condition
- Good
- inspected October 2023
- Type
- Culvert
- Concrete Continuous
- Length
- 28 ft
- 3 main spans
- Daily traffic
- 142,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 215 over Walliser Drain is a concrete continuous culvert carrying Interstate 215 over Walliser Drain in Riverside County, California. It was built in 1994, so it is 31 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 142,000 vehicles a day, roughly 11% of them trucks, projected to reach 185,164 by 2040. The structure is 28 ft (8.5 m) long and 138 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 215 over Walliser Drain built?
It was built in 1994, making it 31 years old in 2025.
What condition is Interstate 215 over Walliser Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Interstate 215 over Walliser Drain carry?
About 142,000 vehicles per day (2020 count), of which roughly 11% are trucks.
How long is Interstate 215 over Walliser Drain?
The structure is 28 ft (8.5 m) long with a longest span of 5 ft (1.5 m) and a deck 138 ft wide.
Who owns Interstate 215 over Walliser Drain?
It is owned by the State Highway Agency.