US Bridges

State Route 86S NB over Cvwd Pipeline Uc

Fair

Riverside County, California · 08-RIV-086-R11.94 · Structure no. 56 0780R

Built
1998
27 years old
Condition
Fair
inspected April 2023
Type
Slab
Concrete
Length
104 ft
3 main spans
Daily traffic
17,500
2020 count
Owner
State
State Highway Agency

About this bridge

State Route 86S NB over Cvwd Pipeline Uc is a concrete slab carrying State Route 86S NB over Cvwd Pipeline Uc in Riverside County, California. It was built in 1998, so it is 27 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,500 vehicles a day, roughly 20% of them trucks, projected to reach 21,400 by 2045. The structure is 104 ft (31.7 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesState Route 86S NB
CrossesCvwd Pipeline Uc
Location08-RIV-086-R11.94
RouteState Highway 86
Coordinates33.58383, -116.09577
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length104 ft (31.7 m)
Longest span36 ft (10.9 m)
Deck width39 ft (11.9 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,500 (2020)
Projected traffic21,400 by 2045
Trucks20%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 86S NB over Cvwd Pipeline Uc built?

It was built in 1998, making it 27 years old in 2025.

What condition is State Route 86S NB over Cvwd Pipeline Uc in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does State Route 86S NB over Cvwd Pipeline Uc carry?

About 17,500 vehicles per day (2020 count), of which roughly 20% are trucks.

How long is State Route 86S NB over Cvwd Pipeline Uc?

The structure is 104 ft (31.7 m) long with a longest span of 36 ft (10.9 m) and a deck 39 ft wide.

Who owns State Route 86S NB over Cvwd Pipeline Uc?

It is owned by the State Highway Agency.