US Bridges

State Route 60 over Camino Real

Fair

Riverside County, California · 08-RIV-060-R6.31 · Structure no. 56 0661

Built
1975
50 years old, rebuilt 2008
Condition
Fair
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
153 ft
1 main span
Daily traffic
237,000
2020 count
Owner
State
State Highway Agency

About this bridge

State Route 60 over Camino Real is a prestressed concrete box beam or girders - multiple carrying State Route 60 over Camino Real in Riverside County, California. It was built in 1975 and reconstructed in 2008, so it is 50 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 237,000 vehicles a day, roughly 13% of them trucks, projected to reach 285,000 by 2040. The structure is 153 ft (46.6 m) long and 164 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesState Route 60
CrossesCamino Real
Location08-RIV-060-R6.31
RouteState Highway 60
Coordinates34.01404, -117.45028
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length153 ft (46.6 m)
Longest span145 ft (44.2 m)
Deck width164 ft (50 m)
Roadway width159 ft (48.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic237,000 (2020)
Projected traffic285,000 by 2040
Trucks13%
Lanes on structure10
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 60 over Camino Real built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2008.

What condition is State Route 60 over Camino Real in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does State Route 60 over Camino Real carry?

About 237,000 vehicles per day (2020 count), of which roughly 13% are trucks.

How long is State Route 60 over Camino Real?

The structure is 153 ft (46.6 m) long with a longest span of 145 ft (44.2 m) and a deck 164 ft wide.

Who owns State Route 60 over Camino Real?

It is owned by the State Highway Agency.