US Bridges

State Route 60 over Day Street

Good

Riverside County, California · 08-RIV-060-13.31-RIV · Structure no. 56 0477

Built
1962
63 years old, rebuilt 2007
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
150 ft
3 main spans
Daily traffic
130,000
2020 count
Owner
State
State Highway Agency

About this bridge

State Route 60 over Day Street is a concrete continuous box beam or girders - multiple carrying State Route 60 over Day Street in Riverside County, California. It was built in 1962 and reconstructed in 2007, so it is 63 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 130,000 vehicles a day, roughly 10% of them trucks, projected to reach 157,776 by 2042. The structure is 150 ft (45.7 m) long and 190 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesState Route 60
CrossesDay Street
Location08-RIV-060-13.31-RIV
RouteState Highway 60
Coordinates33.94233, -117.2793
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96.8 US tons
Inventory rating58.2 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span80 ft (24.4 m)
Deck width190 ft (57.8 m)
Roadway width183 ft (55.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic130,000 (2020)
Projected traffic157,776 by 2042
Trucks10%
Lanes on structure11
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 60 over Day Street built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2007.

What condition is State Route 60 over Day Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does State Route 60 over Day Street carry?

About 130,000 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is State Route 60 over Day Street?

The structure is 150 ft (45.7 m) long with a longest span of 80 ft (24.4 m) and a deck 190 ft wide.

Who owns State Route 60 over Day Street?

It is owned by the State Highway Agency.