State Route 86 SB over Travertine Ditch
FairRiverside County, California · 08-RIV-086-0.09 · Structure no. 56 0163L
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 60 ft
- 2 main spans
- Daily traffic
- 15,300
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
State Route 86 SB over Travertine Ditch is a concrete continuous slab carrying State Route 86 SB over Travertine Ditch in Riverside County, California. It was built in 1989, so it is 36 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,300 vehicles a day, roughly 27% of them trucks, projected to reach 17,794 by 2045. The structure is 60 ft (18.3 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Route 86 SB over Travertine Ditch built?
It was built in 1989, making it 36 years old in 2025.
What condition is State Route 86 SB over Travertine Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does State Route 86 SB over Travertine Ditch carry?
About 15,300 vehicles per day (2020 count), of which roughly 27% are trucks.
How long is State Route 86 SB over Travertine Ditch?
The structure is 60 ft (18.3 m) long with a longest span of 30 ft (9.1 m) and a deck 41 ft wide.
Who owns State Route 86 SB over Travertine Ditch?
It is owned by the State Highway Agency.