CR 413 Spn Rch RD over Spanish Creek
GoodPlumas County, California · 0.1 MI N Bucks Lake RD · Structure no. 09C0155
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected October 2023
- Type
- Slab
- Prestressed Concrete Continuous
- Length
- 116 ft
- 2 main spans
- Daily traffic
- 80
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
CR 413 Spn Rch RD over Spanish Creek is a prestressed concrete continuous slab carrying CR 413 Spn Rch RD over Spanish Creek in Plumas County, California. It was built in 2021, so it is 4 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 80 vehicles a day, roughly 2% of them trucks, projected to reach 95 by 2044. The structure is 116 ft (35.4 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 413 Spn Rch RD over Spanish Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is CR 413 Spn Rch RD over Spanish Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does CR 413 Spn Rch RD over Spanish Creek carry?
About 80 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is CR 413 Spn Rch RD over Spanish Creek?
The structure is 116 ft (35.4 m) long with a longest span of 56 ft (17.2 m) and a deck 29 ft wide.
Who owns CR 413 Spn Rch RD over Spanish Creek?
It is owned by the County Highway Agency.