Crosby Herold Road over Doty Ravine
GoodPlacer County, California · 0.9 MI N of Wise RD · Structure no. 19C0280
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 93 ft
- 1 main span
- Daily traffic
- 600
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Crosby Herold Road over Doty Ravine is a prestressed concrete stringer/multi-beam or girder carrying Crosby Herold Road over Doty Ravine in Placer County, California. It was built in 2021, so it is 4 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 600 vehicles a day, roughly 2% of them trucks, projected to reach 720 by 2043. The structure is 93 ft (28.4 m) long and 36 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Crosby Herold Road over Doty Ravine built?
It was built in 2021, making it 4 years old in 2025.
What condition is Crosby Herold Road over Doty Ravine in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Crosby Herold Road over Doty Ravine carry?
About 600 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is Crosby Herold Road over Doty Ravine?
The structure is 93 ft (28.4 m) long with a longest span of 88 ft (26.7 m) and a deck 36 ft wide.
Who owns Crosby Herold Road over Doty Ravine?
It is owned by the County Highway Agency.