Joiner Parkway EB over UP RR Lincoln Blvd
GoodPlacer County, California · 0.7 MI N of SR 65 · Structure no. 19C0259R
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 403 ft
- 3 main spans
- Daily traffic
- 5,001
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Joiner Parkway EB over UP RR Lincoln Blvd is a prestressed concrete continuous box beam or girders - multiple carrying Joiner Parkway EB over UP RR Lincoln Blvd in Placer County, California. It was built in 2004, so it is 21 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,001 vehicles a day, roughly 10% of them trucks, projected to reach 5,487 by 2043. The structure is 403 ft (122.9 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Joiner Parkway EB over UP RR Lincoln Blvd built?
It was built in 2004, making it 21 years old in 2025.
What condition is Joiner Parkway EB over UP RR Lincoln Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Joiner Parkway EB over UP RR Lincoln Blvd carry?
About 5,001 vehicles per day (2016 count), of which roughly 10% are trucks.
How long is Joiner Parkway EB over UP RR Lincoln Blvd?
The structure is 403 ft (122.9 m) long with a longest span of 151 ft (46.1 m) and a deck 41 ft wide.
Who owns Joiner Parkway EB over UP RR Lincoln Blvd?
It is owned by the City or Municipal Highway Agency.