Harding Blvd over UP BNSF AMTRAK Atlantic
FairPlacer County, California · 0.1M East of Wills Rd. · Structure no. 19C0202
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 440 ft
- 3 main spans
- Daily traffic
- 33,000
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Harding Blvd over UP BNSF AMTRAK Atlantic is a prestressed concrete continuous box beam or girders - multiple carrying Harding Blvd over UP BNSF AMTRAK Atlantic in Placer County, California. It was built in 1993, so it is 32 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 33,000 vehicles a day, roughly 2% of them trucks, projected to reach 40,431 by 2042. The structure is 440 ft (134.1 m) long and 84 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Harding Blvd over UP BNSF AMTRAK Atlantic built?
It was built in 1993, making it 32 years old in 2025.
What condition is Harding Blvd over UP BNSF AMTRAK Atlantic in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Harding Blvd over UP BNSF AMTRAK Atlantic carry?
About 33,000 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is Harding Blvd over UP BNSF AMTRAK Atlantic?
The structure is 440 ft (134.1 m) long with a longest span of 130 ft (39.6 m) and a deck 84 ft wide.
Who owns Harding Blvd over UP BNSF AMTRAK Atlantic?
It is owned by the City or Municipal Highway Agency.