US Bridges

Crystal Springs Ro over Interstate Route 80

Good

Placer County, California · 03-PLA-080-46.31 · Structure no. 19 0209

Built
2023
2 years old
Condition
Good
inspected June 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
160 ft
2 main spans
Daily traffic
1,000
2023 count
Owner
State
State Highway Agency

About this bridge

Crystal Springs Ro over Interstate Route 80 is a prestressed concrete continuous box beam or girders - single or spread carrying Crystal Springs Ro over Interstate Route 80 in Placer County, California. It was built in 2023, so it is 2 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 1,300 by 2042. The structure is 160 ft (48.8 m) long and 49 ft wide.

CarriesCrystal Springs Ro
CrossesInterstate Route 80
Location03-PLA-080-46.31
RouteCounty Highway 0
Coordinates39.20953, -120.78661
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length160 ft (48.8 m)
Longest span76 ft (23.3 m)
Deck width49 ft (14.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2023)
Projected traffic1,300 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Crystal Springs Ro over Interstate Route 80 built?

It was built in 2023, making it 2 years old in 2025.

What condition is Crystal Springs Ro over Interstate Route 80 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Crystal Springs Ro over Interstate Route 80 carry?

About 1,000 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Crystal Springs Ro over Interstate Route 80?

The structure is 160 ft (48.8 m) long with a longest span of 76 ft (23.3 m) and a deck 49 ft wide.

Who owns Crystal Springs Ro over Interstate Route 80?

It is owned by the State Highway Agency.