State Route 65 NB over UP BNSF AMTRAK Taylor CR
FairPlacer County, California · 03-PLA-065-R5.06-RSV · Structure no. 19 0152R
- Built
- 1987
- 38 years old, rebuilt 2019
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 2,096 ft
- 14 main spans
- Daily traffic
- 50,000
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
State Route 65 NB over UP BNSF AMTRAK Taylor CR is a prestressed concrete continuous box beam or girders - multiple carrying State Route 65 NB over UP BNSF AMTRAK Taylor CR in Placer County, California. It was built in 1987 and reconstructed in 2019, so it is 38 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50,000 vehicles a day, roughly 15% of them trucks, projected to reach 60,656 by 2043. The structure is 2,096 ft (638.8 m) long and 79 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Route 65 NB over UP BNSF AMTRAK Taylor CR built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2019.
What condition is State Route 65 NB over UP BNSF AMTRAK Taylor CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does State Route 65 NB over UP BNSF AMTRAK Taylor CR carry?
About 50,000 vehicles per day (2010 count), of which roughly 15% are trucks.
How long is State Route 65 NB over UP BNSF AMTRAK Taylor CR?
The structure is 2,096 ft (638.8 m) long with a longest span of 159 ft (48.6 m) and a deck 79 ft wide.
Who owns State Route 65 NB over UP BNSF AMTRAK Taylor CR?
It is owned by the State Highway Agency.