US Bridges

Douglas-Sunrise Bl over Interstate 80

Good

Placer County, California · 03-PLA-080-1.95-RSV · Structure no. 19 0018

Built
2006
19 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
547 ft
5 main spans
Daily traffic
10,000
2008 count
Owner
State
State Highway Agency

About this bridge

Douglas-Sunrise Bl over Interstate 80 is a prestressed concrete continuous box beam or girders - multiple carrying Douglas-Sunrise Bl over Interstate 80 in Placer County, California. It was built in 2006, so it is 19 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 8% of them trucks, projected to reach 14,282 by 2045. The structure is 547 ft (166.8 m) long and 29 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesDouglas-Sunrise Bl
CrossesInterstate 80
Location03-PLA-080-1.95-RSV
RouteCity Street 0
Coordinates38.74392, -121.27132
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length547 ft (166.8 m)
Longest span141 ft (43 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2008)
Projected traffic14,282 by 2045
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Douglas-Sunrise Bl over Interstate 80 built?

It was built in 2006, making it 19 years old in 2025.

What condition is Douglas-Sunrise Bl over Interstate 80 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Douglas-Sunrise Bl over Interstate 80 carry?

About 10,000 vehicles per day (2008 count), of which roughly 8% are trucks.

How long is Douglas-Sunrise Bl over Interstate 80?

The structure is 547 ft (166.8 m) long with a longest span of 141 ft (43 m) and a deck 29 ft wide.

Who owns Douglas-Sunrise Bl over Interstate 80?

It is owned by the State Highway Agency.