US Bridges

Chiquita Cyn DR over Patrones Pkwy

Good

Orange County, California · 3.3 M S/O Oso Prwy · Structure no. 55C0727

Built
2018
7 years old
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
252 ft
2 main spans
Daily traffic
200
2020 count
Owner
County
County Highway Agency

About this bridge

Chiquita Cyn DR over Patrones Pkwy is a prestressed concrete box beam or girders - single or spread carrying Chiquita Cyn DR over Patrones Pkwy in Orange County, California. It was built in 2018, so it is 7 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 1% of them trucks, projected to reach 300 by 2041. The structure is 252 ft (76.8 m) long and 67 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesChiquita Cyn DR
CrossesPatrones Pkwy
Location3.3 M S/O Oso Prwy
RouteCounty Highway 0
Coordinates33.54678, -117.59383
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length252 ft (76.8 m)
Longest span131 ft (39.9 m)
Deck width67 ft (20.4 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2020)
Projected traffic300 by 2041
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Chiquita Cyn DR over Patrones Pkwy built?

It was built in 2018, making it 7 years old in 2025.

What condition is Chiquita Cyn DR over Patrones Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Chiquita Cyn DR over Patrones Pkwy carry?

About 200 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Chiquita Cyn DR over Patrones Pkwy?

The structure is 252 ft (76.8 m) long with a longest span of 131 ft (39.9 m) and a deck 67 ft wide.

Who owns Chiquita Cyn DR over Patrones Pkwy?

It is owned by the County Highway Agency.