Harvard Avenue over Peter Canyon Was Channel
GoodOrange County, California · 0.1 MI N/O Walnut Ave · Structure no. 55C0682
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Single or Spread
- Concrete
- Length
- 123 ft
- 1 main span
- Daily traffic
- 850
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Harvard Avenue over Peter Canyon Was Channel is a concrete box beam or girders - single or spread carrying Harvard Avenue over Peter Canyon Was Channel in Orange County, California. It was built in 2008, so it is 17 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 850 vehicles a day, roughly 2% of them trucks, projected to reach 1,628 by 2046. The structure is 123 ft (37.6 m) long and 65 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Harvard Avenue over Peter Canyon Was Channel built?
It was built in 2008, making it 17 years old in 2025.
What condition is Harvard Avenue over Peter Canyon Was Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Harvard Avenue over Peter Canyon Was Channel carry?
About 850 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Harvard Avenue over Peter Canyon Was Channel?
The structure is 123 ft (37.6 m) long with a longest span of 120 ft (36.5 m) and a deck 65 ft wide.
Who owns Harvard Avenue over Peter Canyon Was Channel?
It is owned by the City or Municipal Highway Agency.