E/B Bryan Avenue over Peters Canyon Wash
GoodOrange County, California · 0.4 MI E/O Jamboree RD · Structure no. 55C0626R
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 105 ft
- 1 main span
- Daily traffic
- 9,700
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E/B Bryan Avenue over Peters Canyon Wash is a prestressed concrete box beam or girders - multiple carrying E/B Bryan Avenue over Peters Canyon Wash in Orange County, California. It was built in 1998, so it is 27 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,700 vehicles a day, roughly 7% of them trucks, projected to reach 12,073 by 2046. The structure is 105 ft (31.9 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E/B Bryan Avenue over Peters Canyon Wash built?
It was built in 1998, making it 27 years old in 2025.
What condition is E/B Bryan Avenue over Peters Canyon Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does E/B Bryan Avenue over Peters Canyon Wash carry?
About 9,700 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is E/B Bryan Avenue over Peters Canyon Wash?
The structure is 105 ft (31.9 m) long with a longest span of 102 ft (31.1 m) and a deck 43 ft wide.
Who owns E/B Bryan Avenue over Peters Canyon Wash?
It is owned by the City or Municipal Highway Agency.