Heil Ave over Huntington Center Storm
GoodOrange County, California · 0.2 MI E/O Golden West · Structure no. 55C0583
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected September 2023
- Type
- Culvert
- Concrete
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 13,000
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Heil Ave over Huntington Center Storm is a concrete culvert carrying Heil Ave over Huntington Center Storm in Orange County, California. It was built in 1987, so it is 38 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,000 vehicles a day, roughly 1% of them trucks, projected to reach 16,988 by 2040. The structure is 30 ft (9.1 m) long and 80 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 9 Excellent | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Heil Ave over Huntington Center Storm built?
It was built in 1987, making it 38 years old in 2025.
What condition is Heil Ave over Huntington Center Storm in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Heil Ave over Huntington Center Storm carry?
About 13,000 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Heil Ave over Huntington Center Storm?
The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.5 m) and a deck 80 ft wide.
Who owns Heil Ave over Huntington Center Storm?
It is owned by the City or Municipal Highway Agency.