US Bridges

Sand Canyon Avenue over San Diego Creek Channel

Good

Orange County, California · 0.2 Mi. N/O Alton Parkway · Structure no. 55C0565

Built
1988
37 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
197 ft
2 main spans
Daily traffic
26,900
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sand Canyon Avenue over San Diego Creek Channel is a prestressed concrete continuous box beam or girders - multiple carrying Sand Canyon Avenue over San Diego Creek Channel in Orange County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,900 vehicles a day, roughly 7% of them trucks, projected to reach 40,500 by 2041. The structure is 197 ft (60 m) long and 133 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSand Canyon Avenue
CrossesSan Diego Creek Channel
Location0.2 Mi. N/O Alton Parkway
RouteCity Street 0
Coordinates33.66361, -117.77174
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length197 ft (60 m)
Longest span96 ft (29.4 m)
Deck width133 ft (40.5 m)
Roadway width88 ft (26.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,900 (2021)
Projected traffic40,500 by 2041
Trucks7%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sand Canyon Avenue over San Diego Creek Channel built?

It was built in 1988, making it 37 years old in 2025.

What condition is Sand Canyon Avenue over San Diego Creek Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Sand Canyon Avenue over San Diego Creek Channel carry?

About 26,900 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is Sand Canyon Avenue over San Diego Creek Channel?

The structure is 197 ft (60 m) long with a longest span of 96 ft (29.4 m) and a deck 133 ft wide.

Who owns Sand Canyon Avenue over San Diego Creek Channel?

It is owned by the City or Municipal Highway Agency.