E/B Snta Mrgta Pwy over Arroyo Trabuco
FairOrange County, California · 0.2 Mi. Se/O Alicia Pkwy · Structure no. 55C0520R
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,200 ft
- 7 main spans
- Daily traffic
- 29,150
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
E/B Snta Mrgta Pwy over Arroyo Trabuco is a prestressed concrete continuous box beam or girders - multiple carrying E/B Snta Mrgta Pwy over Arroyo Trabuco in Orange County, California. It was built in 1984, so it is 41 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29,150 vehicles a day, roughly 3% of them trucks, projected to reach 49,166 by 2042. The structure is 1,200 ft (365.8 m) long and 68 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E/B Snta Mrgta Pwy over Arroyo Trabuco built?
It was built in 1984, making it 41 years old in 2025.
What condition is E/B Snta Mrgta Pwy over Arroyo Trabuco in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does E/B Snta Mrgta Pwy over Arroyo Trabuco carry?
About 29,150 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is E/B Snta Mrgta Pwy over Arroyo Trabuco?
The structure is 1,200 ft (365.8 m) long with a longest span of 184 ft (56.1 m) and a deck 68 ft wide.
Who owns E/B Snta Mrgta Pwy over Arroyo Trabuco?
It is owned by the County Highway Agency.