Weir Canyon Road over Santa Ana River Channel

Fair

Orange County, California · 0.2 MI North of Fwy 91 · Structure no. 55C0509

Built
1983
42 years old
Condition
Fair
inspected April 2023
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
775 ft
6 main spans
Daily traffic
34,000
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Weir Canyon Road over Santa Ana River Channel is a concrete continuous box beam or girders - multiple carrying Weir Canyon Road over Santa Ana River Channel in Orange County, California. It was built in 1983, so it is 42 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 34,000 vehicles a day, roughly 1% of them trucks, projected to reach 71,480 by 2040. The structure is 775 ft (236.2 m) long and 88 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesWeir Canyon Road
CrossesSanta Ana River Channel
Location0.2 MI North of Fwy 91
RouteCity Street 0
Coordinates33.87405, -117.74752
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans6 (+1 approach)
Design loadHS 20 + Mod
Structure length775 ft (236.2 m)
Longest span132 ft (40.1 m)
Deck width88 ft (26.8 m)
Roadway width75 ft (23 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,000 (2020)
Projected traffic71,480 by 2040
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and waterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Weir Canyon Road over Santa Ana River Channel built?

It was built in 1983, making it 42 years old in 2025.

What condition is Weir Canyon Road over Santa Ana River Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Weir Canyon Road over Santa Ana River Channel carry?

About 34,000 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Weir Canyon Road over Santa Ana River Channel?

The structure is 775 ft (236.2 m) long with a longest span of 132 ft (40.1 m) and a deck 88 ft wide.

Who owns Weir Canyon Road over Santa Ana River Channel?

It is owned by the City or Municipal Highway Agency.