Jeffrey Road Nbnd over San Diego Creek Channel
GoodOrange County, California · 0.2 MI S Barranca Pkway · Structure no. 55C0438R
- Built
- 1980
- 45 years old
- Condition
- Good
- inspected June 2022
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 161 ft
- 2 main spans
- Daily traffic
- 19,100
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Jeffrey Road Nbnd over San Diego Creek Channel is a concrete continuous box beam or girders - multiple carrying Jeffrey Road Nbnd over San Diego Creek Channel in Orange County, California. It was built in 1980, so it is 45 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,100 vehicles a day, roughly 7% of them trucks, projected to reach 40,400 by 2040. The structure is 161 ft (49.1 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jeffrey Road Nbnd over San Diego Creek Channel built?
It was built in 1980, making it 45 years old in 2025.
What condition is Jeffrey Road Nbnd over San Diego Creek Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.
How much traffic does Jeffrey Road Nbnd over San Diego Creek Channel carry?
About 19,100 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is Jeffrey Road Nbnd over San Diego Creek Channel?
The structure is 161 ft (49.1 m) long with a longest span of 79 ft (24.1 m) and a deck 51 ft wide.
Who owns Jeffrey Road Nbnd over San Diego Creek Channel?
It is owned by the City or Municipal Highway Agency.