US Bridges

Edwards ST over Anaheim-Barber City Cha

Good

Orange County, California · 0.2 MI N Trask Ave · Structure no. 55C0402

Built
1975
50 years old
Condition
Good
inspected March 2023
Type
Culvert
Concrete
Length
63 ft
3 main spans
Daily traffic
9,500
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Edwards ST over Anaheim-Barber City Cha is a concrete culvert carrying Edwards ST over Anaheim-Barber City Cha in Orange County, California. It was built in 1975, so it is 50 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,500 vehicles a day, roughly 1% of them trucks, projected to reach 10,618 by 2040. The structure is 63 ft (19.2 m) long and 80 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEdwards ST
CrossesAnaheim-Barber City Cha
Location0.2 MI N Trask Ave
RouteCity Street 0
Coordinates33.76868, -118.01577
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length63 ft (19.2 m)
Longest span20 ft (6.1 m)
Deck width80 ft (24.3 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,500 (2023)
Projected traffic10,618 by 2040
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Edwards ST over Anaheim-Barber City Cha built?

It was built in 1975, making it 50 years old in 2025.

What condition is Edwards ST over Anaheim-Barber City Cha in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Edwards ST over Anaheim-Barber City Cha carry?

About 9,500 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Edwards ST over Anaheim-Barber City Cha?

The structure is 63 ft (19.2 m) long with a longest span of 20 ft (6.1 m) and a deck 80 ft wide.

Who owns Edwards ST over Anaheim-Barber City Cha?

It is owned by the City or Municipal Highway Agency.