US Bridges

Del Obispo Street over Trabuco Creek Channel

Fair

Orange County, California · 0.2 MI W/O Camino Cpstrn · Structure no. 55C0396

Built
1946
79 years old, rebuilt 2012
Condition
Fair
inspected October 2024
Type
Tee Beam
Concrete Continuous
Length
176 ft
5 main spans
Daily traffic
34,000
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Del Obispo Street over Trabuco Creek Channel is a concrete continuous tee beam carrying Del Obispo Street over Trabuco Creek Channel in Orange County, California. It was built in 1946 and reconstructed in 2012, so it is 79 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 34,000 vehicles a day, roughly 1% of them trucks, projected to reach 65,423 by 2046. The structure is 176 ft (53.6 m) long and 85 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesDel Obispo Street
CrossesTrabuco Creek Channel
Location0.2 MI W/O Camino Cpstrn
RouteCity Street 0
Coordinates33.49778, -117.66612
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating27.4 US tons
Inventory rating16.4 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadUnknown
Structure length176 ft (53.6 m)
Longest span85 ft (26 m)
Deck width85 ft (26 m)
Roadway width79 ft (24 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,000 (2016)
Projected traffic65,423 by 2046
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Del Obispo Street over Trabuco Creek Channel built?

It was built in 1946, making it 79 years old in 2025. It was reconstructed in 2012.

What condition is Del Obispo Street over Trabuco Creek Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Del Obispo Street over Trabuco Creek Channel carry?

About 34,000 vehicles per day (2016 count), of which roughly 1% are trucks.

How long is Del Obispo Street over Trabuco Creek Channel?

The structure is 176 ft (53.6 m) long with a longest span of 85 ft (26 m) and a deck 85 ft wide.

Who owns Del Obispo Street over Trabuco Creek Channel?

It is owned by the City or Municipal Highway Agency.