US Bridges

Ellis Avenue over Fountain Valley Channel

Good

Orange County, California · 0.1 Mi. E/O Brookhurst ST · Structure no. 55C0381

Built
1966
59 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
29 ft
3 main spans
Daily traffic
22,000
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ellis Avenue over Fountain Valley Channel is a concrete culvert carrying Ellis Avenue over Fountain Valley Channel in Orange County, California. It was built in 1966, so it is 59 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,000 vehicles a day, roughly 1% of them trucks, projected to reach 45,792 by 2040. The structure is 29 ft (8.8 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEllis Avenue
CrossesFountain Valley Channel
Location0.1 Mi. E/O Brookhurst ST
RouteCity Street 0
Coordinates33.69405, -117.95209
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length29 ft (8.8 m)
Longest span9 ft (2.7 m)
Deck width82 ft (25 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,000 (2021)
Projected traffic45,792 by 2040
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ellis Avenue over Fountain Valley Channel built?

It was built in 1966, making it 59 years old in 2025.

What condition is Ellis Avenue over Fountain Valley Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Ellis Avenue over Fountain Valley Channel carry?

About 22,000 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Ellis Avenue over Fountain Valley Channel?

The structure is 29 ft (8.8 m) long with a longest span of 9 ft (2.7 m) and a deck 82 ft wide.

Who owns Ellis Avenue over Fountain Valley Channel?

It is owned by the City or Municipal Highway Agency.