US Bridges

5th Street over Santa Ana River Channel

Good

Orange County, California · 0.6 MI E/O Harbor Blvd · Structure no. 55C0372

Built
1962
63 years old, rebuilt 2010
Condition
Good
inspected February 2025
Type
Tee Beam
Concrete Continuous
Length
320 ft
7 main spans
Daily traffic
13,000
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

5th Street over Santa Ana River Channel is a concrete continuous tee beam carrying 5th Street over Santa Ana River Channel in Orange County, California. It was built in 1962 and reconstructed in 2010, so it is 63 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,000 vehicles a day, roughly 1% of them trucks, projected to reach 28,348 by 2047. The structure is 320 ft (97.5 m) long and 64 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries5th Street
CrossesSanta Ana River Channel
Location0.6 MI E/O Harbor Blvd
RouteCity Street 0
Coordinates33.74883, -117.90952
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating16.8 US tons
Inventory rating11 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length320 ft (97.5 m)
Longest span49 ft (14.9 m)
Deck width64 ft (19.5 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,000 (2023)
Projected traffic28,348 by 2047
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 5th Street over Santa Ana River Channel built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2010.

What condition is 5th Street over Santa Ana River Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does 5th Street over Santa Ana River Channel carry?

About 13,000 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is 5th Street over Santa Ana River Channel?

The structure is 320 ft (97.5 m) long with a longest span of 49 ft (14.9 m) and a deck 64 ft wide.

Who owns 5th Street over Santa Ana River Channel?

It is owned by the City or Municipal Highway Agency.