US Bridges

S/B Moulton Pkwy over Aliso Creek

Good

Orange County, California · 1.5 MI S El Toro RD · Structure no. 55C0221L

Built
1987
38 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
200 ft
2 main spans
Daily traffic
12,272
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

S/B Moulton Pkwy over Aliso Creek is a prestressed concrete continuous box beam or girders - multiple carrying S/B Moulton Pkwy over Aliso Creek in Orange County, California. It was built in 1987, so it is 38 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,272 vehicles a day, roughly 1% of them trucks, projected to reach 26,696 by 2043. The structure is 200 ft (61 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS/B Moulton Pkwy
CrossesAliso Creek
Location1.5 MI S El Toro RD
RouteCity Street 0
Coordinates33.58938, -117.71167
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length200 ft (61 m)
Longest span96 ft (29.3 m)
Deck width52 ft (15.8 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,272 (2022)
Projected traffic26,696 by 2043
Trucks1%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S/B Moulton Pkwy over Aliso Creek built?

It was built in 1987, making it 38 years old in 2025.

What condition is S/B Moulton Pkwy over Aliso Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does S/B Moulton Pkwy over Aliso Creek carry?

About 12,272 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is S/B Moulton Pkwy over Aliso Creek?

The structure is 200 ft (61 m) long with a longest span of 96 ft (29.3 m) and a deck 52 ft wide.

Who owns S/B Moulton Pkwy over Aliso Creek?

It is owned by the City or Municipal Highway Agency.