Brookhurst Street over Anaheim Barber City Chan
GoodOrange County, California · 0.15 MI N/O Orangewood Av · Structure no. 55C0091
- Built
- 1963
- 62 years old, rebuilt 1974
- Condition
- Good
- inspected September 2023
- Type
- Culvert
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 31,000
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Brookhurst Street over Anaheim Barber City Chan is a concrete culvert carrying Brookhurst Street over Anaheim Barber City Chan in Orange County, California. It was built in 1963 and reconstructed in 1974, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 31,000 vehicles a day, roughly 1% of them trucks, projected to reach 45,000 by 2040. The structure is 22 ft (6.7 m) long and 142 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Brookhurst Street over Anaheim Barber City Chan built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1974.
What condition is Brookhurst Street over Anaheim Barber City Chan in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Brookhurst Street over Anaheim Barber City Chan carry?
About 31,000 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Brookhurst Street over Anaheim Barber City Chan?
The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 142 ft wide.
Who owns Brookhurst Street over Anaheim Barber City Chan?
It is owned by the City or Municipal Highway Agency.