US Bridges

Tustin Street over Santiago Creek Channel

Fair

Orange County, California · 0.3 Mi. N/O Route 22 Fwy · Structure no. 55C0043

Built
1941
84 years old, rebuilt 1986
Condition
Fair
inspected April 2023
Type
Tee Beam
Concrete Continuous
Length
239 ft
5 main spans
Daily traffic
27,600
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Tustin Street over Santiago Creek Channel is a concrete continuous tee beam carrying Tustin Street over Santiago Creek Channel in Orange County, California. It was built in 1941 and reconstructed in 1986, so it is 84 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 27,600 vehicles a day, roughly 1% of them trucks, projected to reach 81,773 by 2043. The structure is 239 ft (72.8 m) long and 96 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTustin Street
CrossesSantiago Creek Channel
Location0.3 Mi. N/O Route 22 Fwy
RouteCity Street 0
Coordinates33.77984, -117.83561
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.8 US tons
Inventory rating42.5 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadH 20
Structure length239 ft (72.8 m)
Longest span52 ft (15.8 m)
Deck width96 ft (29.3 m)
Roadway width85 ft (25.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,600 (2021)
Projected traffic81,773 by 2043
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Tustin Street over Santiago Creek Channel built?

It was built in 1941, making it 84 years old in 2025. It was reconstructed in 1986.

What condition is Tustin Street over Santiago Creek Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Tustin Street over Santiago Creek Channel carry?

About 27,600 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Tustin Street over Santiago Creek Channel?

The structure is 239 ft (72.8 m) long with a longest span of 52 ft (15.8 m) and a deck 96 ft wide.

Who owns Tustin Street over Santiago Creek Channel?

It is owned by the City or Municipal Highway Agency.