US Bridges

On-Ramp 405 over Route 39

Good

Orange County, California · 12-ORA-405-15.00-HNTB · Structure no. 55 1132G

Built
2024
1 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
220 ft
2 main spans
Daily traffic
2,000
2024 count
Owner
State
State Highway Agency

About this bridge

On-Ramp 405 over Route 39 is a prestressed concrete continuous box beam or girders - multiple carrying On-Ramp 405 over Route 39 in Orange County, California. It was built in 2024, so it is 1 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 7% of them trucks, projected to reach 2,690 by 2044. The structure is 220 ft (67.1 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOn-Ramp 405
CrossesRoute 39
Location12-ORA-405-15.00-HNTB
RouteInterstate 405
Coordinates33.73308, -117.98908
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length220 ft (67.1 m)
Longest span111 ft (33.9 m)
Deck width39 ft (12 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2024)
Projected traffic2,690 by 2044
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was On-Ramp 405 over Route 39 built?

It was built in 2024, making it 1 years old in 2025.

What condition is On-Ramp 405 over Route 39 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does On-Ramp 405 over Route 39 carry?

About 2,000 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is On-Ramp 405 over Route 39?

The structure is 220 ft (67.1 m) long with a longest span of 111 ft (33.9 m) and a deck 39 ft wide.

Who owns On-Ramp 405 over Route 39?

It is owned by the State Highway Agency.