US Bridges

Interstate 405 over San Diego Creek Channel

Good

Orange County, California · 12-ORA-405-1.50-IRVN · Structure no. 55 0451

Built
1968
57 years old, rebuilt 1990
Condition
Good
inspected January 2025
Type
Girder and Floorbeam System
Concrete Continuous
Length
123 ft
2 main spans
Daily traffic
205,000
2015 count
Owner
State
State Highway Agency

About this bridge

Interstate 405 over San Diego Creek Channel is a concrete continuous girder and floorbeam system carrying Interstate 405 over San Diego Creek Channel in Orange County, California. It was built in 1968 and reconstructed in 1990, so it is 57 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 205,000 vehicles a day, roughly 5% of them trucks, projected to reach 234,397 by 2045. The structure is 123 ft (37.4 m) long and 237 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 405
CrossesSan Diego Creek Channel
Location12-ORA-405-1.50-IRVN
RouteInterstate 405
Coordinates33.651, -117.75605
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length123 ft (37.4 m)
Longest span60 ft (18.3 m)
Deck width237 ft (72.2 m)
Roadway width233 ft (71 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic205,000 (2015)
Projected traffic234,397 by 2045
Trucks5%
Lanes on structure12
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Interstate 405 over San Diego Creek Channel built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1990.

What condition is Interstate 405 over San Diego Creek Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Interstate 405 over San Diego Creek Channel carry?

About 205,000 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Interstate 405 over San Diego Creek Channel?

The structure is 123 ft (37.4 m) long with a longest span of 60 ft (18.3 m) and a deck 237 ft wide.

Who owns Interstate 405 over San Diego Creek Channel?

It is owned by the State Highway Agency.