US Bridges

Interstate 605 over Coyote Creek

Good

Orange County, California · 12-ORA-605-R1.60-LALM · Structure no. 55 0406

Built
1966
59 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
356 ft
4 main spans
Daily traffic
187,000
2015 count
Owner
State
State Highway Agency

About this bridge

Interstate 605 over Coyote Creek is a concrete continuous box beam or girders - multiple carrying Interstate 605 over Coyote Creek in Orange County, California. It was built in 1966, so it is 59 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 187,000 vehicles a day, roughly 3% of them trucks, projected to reach 216,574 by 2041. The structure is 356 ft (108.4 m) long and 147 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesInterstate 605
CrossesCoyote Creek
Location12-ORA-605-R1.60-LALM
RouteInterstate 605
Coordinates33.80585, -118.08117
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length356 ft (108.4 m)
Longest span93 ft (28.2 m)
Deck width147 ft (44.9 m)
Roadway width144 ft (43.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic187,000 (2015)
Projected traffic216,574 by 2041
Trucks3%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Interstate 605 over Coyote Creek built?

It was built in 1966, making it 59 years old in 2025.

What condition is Interstate 605 over Coyote Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Interstate 605 over Coyote Creek carry?

About 187,000 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is Interstate 605 over Coyote Creek?

The structure is 356 ft (108.4 m) long with a longest span of 93 ft (28.2 m) and a deck 147 ft wide.

Who owns Interstate 605 over Coyote Creek?

It is owned by the State Highway Agency.