Main ST over State Route 22
FairOrange County, California · 12-ORA-022-R10.99-SA · Structure no. 55 0363
- Built
- 1963
- 62 years old, rebuilt 1992
- Condition
- Fair
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 185 ft
- 2 main spans
- Daily traffic
- 22,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Main ST over State Route 22 is a concrete continuous box beam or girders - multiple carrying Main ST over State Route 22 in Orange County, California. It was built in 1963 and reconstructed in 1992, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,000 vehicles a day, roughly 3% of them trucks, projected to reach 23,126 by 2041. The structure is 185 ft (56.4 m) long and 106 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST over State Route 22 built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1992.
What condition is Main ST over State Route 22 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Main ST over State Route 22 carry?
About 22,000 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Main ST over State Route 22?
The structure is 185 ft (56.4 m) long with a longest span of 90 ft (27.4 m) and a deck 106 ft wide.
Who owns Main ST over State Route 22?
It is owned by the State Highway Agency.