S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp
FairOrange County, California · 12-ORA-005-34.38-SA · Structure no. 55 0344H
- Built
- 1963
- 62 years old, rebuilt 1995
- Condition
- Fair
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 112 ft
- 3 main spans
- Daily traffic
- 54,323
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp is a concrete continuous box beam or girders - multiple carrying S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp in Orange County, California. It was built in 1963 and reconstructed in 1995, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 54,323 vehicles a day, roughly 3% of them trucks, projected to reach 59,552 by 2041. The structure is 112 ft (34.1 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1995.
What condition is S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp carry?
About 54,323 vehicles per day (2015 count), of which roughly 3% are trucks.
How long is S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp?
The structure is 112 ft (34.1 m) long with a longest span of 50 ft (15.2 m) and a deck 57 ft wide.
Who owns S5&S57-W22 Conn over S57-BRISTOL ST Off-Ramp?
It is owned by the State Highway Agency.