Brockway Road over Truckee River
FairNevada County, California · 0.1 MI S/O Donner Pass RD · Structure no. 17C0094
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 175 ft
- 1 main span
- Daily traffic
- 9,170
- 2009 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Brockway Road over Truckee River is a prestressed concrete box beam or girders - multiple carrying Brockway Road over Truckee River in Nevada County, California. It was built in 1993, so it is 32 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,170 vehicles a day, roughly 2% of them trucks, projected to reach 21,881 by 2042. The structure is 175 ft (53.3 m) long and 56 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Brockway Road over Truckee River built?
It was built in 1993, making it 32 years old in 2025.
What condition is Brockway Road over Truckee River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Brockway Road over Truckee River carry?
About 9,170 vehicles per day (2009 count), of which roughly 2% are trucks.
How long is Brockway Road over Truckee River?
The structure is 175 ft (53.3 m) long with a longest span of 175 ft (53.3 m) and a deck 56 ft wide.
Who owns Brockway Road over Truckee River?
It is owned by the City or Municipal Highway Agency.