US Bridges

Interstate 80 WB over Donner Lake Road

Fair

Nevada County, California · 03-NEV-080-R9.07L · Structure no. 17 0076L

Built
1963
62 years old, rebuilt 1991
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
271 ft
3 main spans
Daily traffic
12,400
2020 count
Owner
State
State Highway Agency

About this bridge

Interstate 80 WB over Donner Lake Road is a steel stringer/multi-beam or girder carrying Interstate 80 WB over Donner Lake Road in Nevada County, California. It was built in 1963 and reconstructed in 1991, so it is 62 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,400 vehicles a day, roughly 11% of them trucks, projected to reach 21,519 by 2042. The structure is 271 ft (82.6 m) long and 54 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesInterstate 80 WB
CrossesDonner Lake Road
Location03-NEV-080-R9.07L
RouteInterstate 80
Coordinates39.33166, -120.28992
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length271 ft (82.6 m)
Longest span90 ft (27.4 m)
Deck width54 ft (16.6 m)
Roadway width52 ft (15.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,400 (2020)
Projected traffic21,519 by 2042
Trucks11%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 80 WB over Donner Lake Road built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1991.

What condition is Interstate 80 WB over Donner Lake Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Interstate 80 WB over Donner Lake Road carry?

About 12,400 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is Interstate 80 WB over Donner Lake Road?

The structure is 271 ft (82.6 m) long with a longest span of 90 ft (27.4 m) and a deck 54 ft wide.

Who owns Interstate 80 WB over Donner Lake Road?

It is owned by the State Highway Agency.