US Bridges

Fdr 18 over Bear River

GoodPosted for load

Nevada County, California · No Data Entered · Structure no. 051755000001017

Built
1984
41 years old
Condition
Good
inspected September 2024
Type
Girder and Floorbeam System
Steel
Length
30 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Fdr 18 over Bear River is a steel girder and floorbeam system carrying Fdr 18 over Bear River in Nevada County, California. It was built in 1984, so it is 41 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 30 ft (9.1 m) long and 30 ft wide.

CarriesFdr 18
CrossesBear River
LocationNo Data Entered
RouteFederal Lands Road 18
Coordinates39.30981, -120.66508
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating20.4 US tons
Inventory rating15.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span30 ft (9.1 m)
Deck width30 ft (9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fdr 18 over Bear River built?

It was built in 1984, making it 41 years old in 2025.

What condition is Fdr 18 over Bear River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Fdr 18 over Bear River carry?

About 50 vehicles per day (latest count).

How long is Fdr 18 over Bear River?

The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 30 ft wide.

Who owns Fdr 18 over Bear River?

It is owned by the U.S. Forest Service.