Berry Street over Napa River

Good

Napa County, California · SE of Washington Street · Structure no. 21C0142

Built
2018
7 years old
Condition
Good
inspected August 2023
Type
Slab
Prestressed Concrete
Length
77 ft
1 main span
Daily traffic
1,500
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Berry Street over Napa River is a prestressed concrete slab carrying Berry Street over Napa River in Napa County, California. It was built in 2018, so it is 7 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 10% of them trucks, projected to reach 1,855 by 2045. The structure is 77 ft (23.4 m) long and 55 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesBerry Street
CrossesNapa River
LocationSE of Washington Street
RouteCity Street 0
Coordinates38.57934, -122.58216
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length77 ft (23.4 m)
Longest span74 ft (22.7 m)
Deck width55 ft (16.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2018)
Projected traffic1,855 by 2045
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Berry Street over Napa River built?

It was built in 2018, making it 7 years old in 2025.

What condition is Berry Street over Napa River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Berry Street over Napa River carry?

About 1,500 vehicles per day (2018 count), of which roughly 10% are trucks.

How long is Berry Street over Napa River?

The structure is 77 ft (23.4 m) long with a longest span of 74 ft (22.7 m) and a deck 55 ft wide.

Who owns Berry Street over Napa River?

It is owned by the City or Municipal Highway Agency.